Wichita Air Terminal
- Location: Wichita, KS
- General Contractor: Key/Walbridge JV
A new 273,000 sq. ft. terminal with 12 gates, constructed at a cost of $100 million. The terminal includes ticketing areas, a business center, and administrative offices. The doors, frames, and hardware package was greater than $600,000.